1952 Bay Street Victoria, B.C. V8R 1J8 | Visit Official Website (opens in a new tab)
Inspection Information
Facility Type
15 - 300 Connections
Inspection Type
Routine
Inspection Date
July 23, 2026
Number of critical violations
0
Number of non-critical violations
7
Violations:
A summary of the violations found during the inspection are listed below.Code
Description
314
Non-Critical Improper maintenance of distribution system
No testing of chlorine residual or chlorine residual log, no maintenance log available. No UV.
Corrective Actions: The water supplier is to test and monitor the residual chlorine levels in the water supply on a daily basis and keep a log of these records, and all other maintenance work, to be reviewed by the DWO when requested. The operating permit will be updated to reflect these changes.
316
Non-Critical Source unprotected and subject to contamination
Well cap does not have a secure up to date well cap, is rusting, and pooling water observed around well casing.
Corrective Actions: Implement a plan to upgrade well cap to prevent potential contamination and remove or install drainage system in concrete barrier around wellhead to prevent any pooling water
318
Non-Critical Inadequate Microbiological Analysis data
0 out of 1 required bacteriological samples have been submitted for 2025. July 2026 water samples received. Regular bacteriological water samples required under Drinking Water Protection Act and Regulation
Corrective Actions: Submit drinking water samples to our office as per required sampling frequency listed by DWO
319
Non-Critical Inadequate Chemical Analysis Data
Last raw water chemical analysis was completed 17 June 2019. Chemical analyses should be completed every 3-5 years
Corrective Actions: Submit raw water samples to an approved lab for full chemical analysis and provide results by September 1, 2026.
322
Non-Critical Emergency Response Plan
Emergency Response Plan (ERP) has not been updated since 2023, when drought plan was implemented
Corrective Actions: Update and submit an ERP by September 1, 2026. Template will be provided.
323
Non-Critical Other
No record of annual reports submitted to this office. As per the Drinking Water Protection Regulation, a water supplier must prepare and make public, within 6 months of the end of the calendar year (June 30), an annual report of the results of monitoring required by this regulation. Operator with limited documentation on system.
Corrective Actions: Complete and submit the 2025 annual report by September 1, 2026. A Template will be provided. Annual report for 2026 to be submitted by June 30, 2027.
323
Non-Critical Other
Tall grass obstructing access to well head and treatment room requires a thorough cleaning and sanitizing
Corrective Actions: Remove tall grass from around well head to allow improve access and clean out treatment room