This facility was given a Low hazard rating. More info


Inspection Information

Facility Type

2-14 Connections

Inspection Type

Follow-Up

Inspection Date

December 4, 2025

Number of critical violations

1

Number of non-critical violations

4



Violations:
A summary of the violations found during the inspection are listed below.


Code
Description

311

Critical Interruption of Treatment

There is currently a boil water notice due to UV failure.

Corrective Actions: The UV system must be repaired. This repair must not be completed until a construction permit or waiver is obtained from our office. Timeline: Timeline for repair has not yet been set. Timeline updated: March 26,2025

316

Non-Critical Source unprotected and subject to contamination

The wellhead does not have a proper cap/cover. It is covered by a tarp, plywood, and weighted top.

Corrective Actions: Repair the wellhead to provide a secure, vermin proof, watertight cap or cover. Timeline updated: March 26, 2025

317

Non-Critical Inadequate or improper construction of water works

Construction has occurred on the water system without approval from our office.

Corrective Actions: Provide the documentation required for a construction permit waiver or permit request for our office's review. This is for any waterline replacement or other construction that has occurred without approval. Timeline updated: March 26, 2025

322

Non-Critical Emergency Response Plan

An emergency response plan has been submitted in 2012, but this information is outdated. A drought plan has also been submitted.

Corrective Actions: Update the ERP and review it annually. Timeline updated: March 26, 2025

323

Non-Critical Other

An annual report has not been provided to water users or our office since 2018.

Corrective Actions: Complete the 2024 annual report and submit it to our office and provide it to the water users. Ensure all annual reports are completed within six months of the year's end. Timeline Updated: March 26, 2025



Comments
A follow up inspection was conducted with the system operator. The outstanding violations with timelines set were granted extensions to allow for more time for information to be obtained, funding, and obtaining professional assistance. A preliminary conclusion to the GARP assessment will be provided. The operator must hire an authorized person (ROWP or engineer) to assess works completed on the adjacent onsite sewerage system. The GARP assessment may be updated based upon this assessment. New sites will be created for water sampling: - Site # 9 - Site # 11 A site for the pumphouse will be created in the future.