Island Health
1952 Bay Street Victoria, B.C. V8R 1J8 | Visit Official Website (opens in a new tab)
1952 Bay Street Victoria, B.C. V8R 1J8 | Visit Official Website (opens in a new tab)
5040 Central Rd Hornby Island, BC V0R 1Z0
This facility was given a Low hazard rating. More info
Inspection Information
Facility Type
15 - 300 Connections
Inspection Type
Routine
Inspection Date
July 21, 2026
Number of critical violations
0
Number of non-critical violations
1
Violations:
A summary of the violations found during the inspection are listed below.Code
Description
314
Non-Critical Improper maintenance of distribution system
Chlorine residual measured 0 ppm in the distribution system. The operator stated much of the water system was not in use, which may have lead to stagnant water in the lines.
Corrective Actions: Ensure chlorine residuals are maintained between 0.2-0 ppm and tested regularly. Dead end lines and the distribution system should be flushed routinely to remove stagnant water.
Comments
Comments:
Source: A single deep well is the sole primary source. The well head was in good condition and the well tag was affixed to the well head. (Well ID Plate #25421).
Treatment:
Cartridge filtration contains 5 micron and 1 micron ( absolute) filters. Two sets of filters are located in parallel. Chlorine is dosed after the filters and before the cistern, A tap is located after the cistern to sample for chlorine disinfection. Chlorine is to be measured after the cistern and at the furthest point in the distribution.
Storage:
Consists of a single 3000 US gallon tank. A water level meter was being installed at the time of the inspection. The cistern was secure and in good condition.
Distribution system:
Housing project is still moving in new residents. It is recommended to regularly flush the lines to remove stagnant water. Chlorine residuals must be maintained between 0.2-2 ppm in the furthest point in the distribution system. It is recommended each connection in the distribution system have a water meter for easier leak detection.
Emergency response plan and documentation:
The ERP is to be reviewed and updated annually or as needed. Operator to ensure annual reports are completed for each year and a copy made available by June 30th of the following year. Maintenance records must be kept on site and provided up request.
Water sampling:
Bacteriological samples are to be collected bi-weekly. Chemical analyses are to be provided to the DWO every 5 years or as requested.