1952 Bay Street Victoria, B.C. V8R 1J8 | Visit Official Website (opens in a new tab)
Inspection Information
Facility Type
15 - 300 Connections
Inspection Type
Routine
Inspection Date
October 26, 2026
Number of critical violations
0
Number of non-critical violations
5
Violations:
A summary of the violations found during the inspection are listed below.Code
Description
314
Non-Critical Improper maintenance of distribution system
No operator on-site with small water systems training. The water supplier must designate a water operator who has training in water system operations.
Corrective Actions: Identify this person and complete the smaller water systems training (e.g., BCWWA's Small Water System course).
316
Non-Critical Source unprotected and subject to contamination
Well house door has light shining through the crevices in closed position. This can allow for potential pest entry to the source water housing.
Corrective Actions: Implement door sweeps or tighter seals. After these repairs are completed, clean the pumphouse to allow for monitoring of effectiveness of repairs. Ensure all other possible entry points are screened and sealed in a manner that prevents ease of access for pests/rodents. Deadline: 2 weeks.
318
Non-Critical Inadequate Microbiological Analysis data
Finished water samples have shown periodic positive total coliform results, while the submitted raw water results have not indicated the presence of total coliforms. This may suggest potential contamination within the reservoir or distribution system.
Corrective Actions: Propose a distribution system sampling plan that includes locations near the reservoir and at representative points throughout the distribution system. The sampling plan should assist in identifying potential areas of compromised system integrity, biofilm accumulation, or inadequate flushing and disinfection (shocking) that may contribute to the periodic positive total coliform results. Submit the proposed sampling locations and schedule for review. Deadline: 2 weeks.
322
Non-Critical Emergency Response Plan
An emergency response plan has been submitted in June 15, 2021, but this information is outdated. The drought component was submitted: May 1, 2023.
Corrective Actions: Take the following actions: 1. Draft and submit an Emergency Response Plan to the area EHO. Templates will be emailed to the operator. Review the provincial ERP guideline to ensure all required components are addressed. 2. Update the ERP and review it annually.
323
Non-Critical Other
The annual report for 2025 was not submitted before June 30.
Corrective Actions: Take the following actions: 1. Complete the 2025 annual report and submit it to our office. 2. Provide a copy to all water users. 3. Ensure all annual reports, moving forward, are completed within six months of the year's end (June 30).