The lighting issues will be addressed with MX and increased properly, the holes will be sealed around the piping at sinks, the expansion joint will be caulked, the school will utilize the 3 vat sink for dishes until the part arrives for the dish machine. The dish machine will need to be checked for proper operation prior to the school using it for dish washing. A inspection will be conducted on September 6, 2022 to verify all equipment temperatures and ensure that the cleaning has been completed in all areas.