1st Pre-opening inspection. Some items left to be completed include lighting in service area, self-closing employee bathroom door, 3-compt sink sanitizer and test strips, flooring and coving in dry storage.
Machine Name | Sanitization Method | Thermo Label | PPM | Sanitizer Name | Sanitizer Type | Temperature |
3-compt sink | Chemical | 0 | MC-10 | Quat | 137 °F | |
Ecolab | Chemical | 75 | Chlorine | 120 °F |
Description | Temperature |
Women's restroom sink | 101 °F |
Reach-in kitchen | 32 °F |
Bar prep | 38 °F |
Left prep | 36 °F |
Walk-in | 37.9 °F |
Kitchen handsink - 3 compt | 114 °F |
Right prep | 34 °F |
Service hand sink | 134 °F |
Employee restroom sink | 123 °F |
Bar hand sink | 105 °F |
Walk-in freezer | 13.6 °F |
Service prep | 32 °F |
Cooler bar for milk/cream | 35 °F |
Men's restroom sink | 104 °F |