53: 2920 The toilet room door does not self close.
Corrective Actions: Install a self closure on the toilet room door to allow the door to close automatically. (Correct by 30 day inspection.)
55: 2810 1. The ceiling tiles of the kitchen, dishroom, and bathroom are not the smooth, durable, cleanable kind. 2. The floor under the mop sink, water heater, and dishroom shelving is not flush with the tiled floor.
Corrective Actions: 1. The ceiling of the kitchen, dishroom, and bathroom needs to be smooth, durable, and cleanable. (90 days to correct.) 2. The floor needs to be smooth, durable, and cleanable to prevent dirt and debris build up. (Corrected. PIC will use a shop vac to keep this area clean.)
Discussed the need for a backflow prevention device for the mop sink if attaching a hose that is long enough to sit below the flood rim, or attaching a chemical mixing system.
Certificate of Occupancy has been issued.
Permit to Operate is issued. This form will serve as the permit to operate until the official one is received by mail.
Machine Name | Sanitization Method | Thermo Label | PPM | Sanitizer Name | Sanitizer Type | Temperature |
3 basin sink | chemical | Chlorine | 117 °F |
Description | Temperature |
Right reach-in cooler (bread) | 40 °F |
Reach-in cooler (meat) | 29 °F |
Prep unit | 33 °F |
Left reach-in cooler (produce) | 41 °F |