Critical item #21 from routine inspection dated 6/18/21 has been corrected. Pool is ok to reopen.
Critical item #18 from routine inspection dated 6/18/21 has NOT been corrected. I will come back for another follow-up. Failure to correct critical violations within 10 days of routine inspection date may result in cesation of operation.