*10: Next replaster the steps must be marked on the side.
*13: Another floor drain on the deck must be provided between bathroom and pump room. In the mean time a mat must be provided until the floor drain is installed.
20: pH is too high
*32: Backwash is overflowing must be fixed in 30 days.
Additional Comments
Flow rate indicator = 80 GPM Permit is approved. All violations must be corrected within 30 days.
Observations
OUT
*10 Depth markers, diving boards, towers, fencing
Observations
OUT
*13 General Safety: no broken bottles, cans, glass, sharp objects
Observations
OUT
20 pH range, total alkalinity, cyanuric acid level