Hotel is under renovation. 1st floor: excessive paint peeling, dirty ceiling vents, dirty, stained carpet in seating area Laundry facility: cracked floor tile Room 309: frost in refrigerator, holes and burns in sheets, stained pillows, mattress cover, and mattress, mold outside of bathroom on ceiling 3rd and 2nd floor ice machines: presence of pink slime and mold. Drain, then wash, rinse, and sanitize Room 208: stained comforter, pillows, mattress cover, lamp shades, and stained bathtub, door is peeling/door shavings exposed
Observations
OUT
5 Ice machine clean, maintained, free of contaminants
Observations
OUT
25 Toilet and bathing facilities: adequate, location, designed, clean, good repair, tissue, soap, waste receptacle