5: 2nd floor ice machine has excessive black build up on chute dispenser
24: Ceiling of pavilion covering unload area has damage, exposed framing. Pic stated it was struck with a vehicle 2 months ago, awaiting insurance payout to repair. See pic.
25: 127 toilet seat lid is scratched
28: 233 telephone not operational
30: Vent in 133 bathroom has excessive dust build up
36: Cracked floor tile in first floor lobby, multiple cracked tile on elevator.
37: Walls in first floor stairwell near 133 have been poorly painted