-14: Water at handsink in girls and boys restrooms did not meet the 90-120 threshold. The water did not get hot.
21: Ceiling tile ripped in gymnasium.
21: Missing and water-damaged ceiling tile above storage closet in girls bathroom.
21: Ceiling tile with water damage in boys restroom.
*40: Child protective outlets on multiple electrical strips not supplied with covers in smart lab.
Corrective Action: PIC supplied each outlet with a protective cap.
Smapphumphrey@bgcmt.org
Rooms inspected: Dreamerland (ages 5-6), Art room (all ages),Club store, gymnasium, smart lab, outdoor playground area (HUD), girls and boys bathrooms.
Notes:
-Water fountains in gym shut off due to covid. Using freshly-supplied water stations in the games room.
-All exit signs lit and in working order.