14B: .05(10)(a) Several large containers stacked wet. Clean equipment and utensils shall be stored in a self-draining position that allows air drying and covered or inverted. (C)
Corrective Actions: PIC was instructed to remove the containers from the vertical stack and allowed to air dry individually face down.
17C: .07(5)(a),(b)1,2,3The following must be addressed: 1. Wall behind warewashing sink and the food prep sink with heavy build up. 2. Floor in warewashing area missing grout between the floor tiles. 3. FRP juncture at the mop sink broken and FRP disconnected from wall. // hood vents excessive build-up.
The floors in food service establishments in which water flush cleaning methods are used shall be provided with drains and be graded to drain, and the floor and wall junctures shall be coved and sealed. (C)
www.gnrhealth.com
QUESTIONS?? 770-963-5132
All cold holding and hot holding in compliance unless noted otherwise.
Additives: vanilla extract
Inspection conducted w/ MRB